What each flowchart shape means, when to use it, and one real flowchart that uses them all.
Flowchart symbols are the standard shapes a flowchart uses to show what kind of step each box is: an oval for the start and end, a rectangle for an action, a diamond for a yes/no decision, a parallelogram for information coming in or going out, and connectors, the arrows between them, for the order. Most flowcharts need only those. Pick each shape by what the step does, write a short label inside, and join the shapes with connectors.
Figure 1Flowchart symbols and their meanings. The basic five symbols on top, and three extras below for when a process needs them. Every symbol is drawn in the same style, so the shape alone carries the meaning. The decision diamond is the only one with more than one connector leaving it, one for each answer.
The basic five: almost every flowchart uses them
Add these when the process needs them
Flowchart symbols, also called flowchart shapes, are a shared set of shapes that each carry one meaning, so anyone can read a flowchart without a key. The shape says what kind of step it is, such as an action, a decision or the end of the process. The label inside says what happens, and connectors show the order.
The shapes have been standard for more than 50 years. The American National Standards Institute published them as ANSI X3.5-1970, which the US government adopted on March 19, 1973 as FIPS PUB 24, “Flowchart Symbols and Their Usage in Information Processing” (NIST). The international standard, ISO 5807, dates from 1985 (Wikipedia). Few teams follow either to the letter, and that’s fine. ASQ, the American Society for Quality, puts it this way: “the right way is the way that helps those involved understand the process” (ASQ).
The 5 basic symbols of a flowchart are the oval for the start and end, the rectangle for a step, the diamond for a decision, the parallelogram for input or output, and the connector, an arrow, for the order of the steps. Those five can draw almost any process. Each one also tells you what kind of label to write inside it.
Here’s what each basic symbol means, with labels from the expense claim example further down. The key next to each shape adds it to a Whimsical board:
Symbol | Shape and key | What it means | What to write in it |
|---|---|---|---|
Terminal | Oval (key | Where the process starts or ends | The event: “Employee submits a claim” |
Process | Rectangle (key | One action | Who does what: “Manager checks the claim” |
Decision | Diamond (key | A question with two or more answers | The question: “Over $500?” |
Input/output | Parallelogram (shapes menu, key | Information coming in or going out | What it is: “Receipt and claim form” |
Connector | Line with an arrowhead (key | The order of the steps | Nothing, or the answer when it leaves a diamond: “Yes” |
An oval in a flowchart is the terminal symbol: it marks where the process starts and where it ends. FIPS PUB 24 defines it as “a terminal point in a flowchart, for example, start, stop, halt, delay, or interrupt” (NIST). A pill or a rounded rectangle means the same thing.
A flowchart has one start but can have several ends, one for each way the process can finish. Write the event rather than the word “Start”: “Employee submits a claim” tells the reader what sets things off.
A rectangle in a flowchart is the process symbol: one action that a person or a system does. It’s the shape most steps use. Write who does what, and keep it to one action, such as “Finance pays the claim”.
ASQ notes that usually only one arrow, or connector, goes out of a process box (ASQ). When you find yourself drawing two, the step is hiding a decision. Give it a diamond.
A diamond in a flowchart is the decision symbol: a question whose answer sends the process down different paths. Write the question inside, usually one with a yes or no answer, and label every connector that leaves the diamond with its answer. In ASQ’s words, “More than one arrow goes out of the diamond, each one showing the direction the process takes for a given answer to the question” (ASQ).
A parallelogram in a flowchart is the input/output symbol: information that enters the process or leaves it, such as a form someone fills in, a file that’s uploaded or a report that’s sent. FIPS PUB 24 calls it “the making available of information for processing (input), or the recording of processed information (output)” (NIST). If it’s something a person does, it’s a rectangle.
Connectors in a flowchart, the arrows the standards call flowlines, show the order of the steps: each one points from a step to the one that comes next. Flowcharts usually read from top to bottom and left to right (Wikipedia). Every step except an end needs a connector out, and every connector that leaves a diamond needs a label.
Beyond the basic five, the standards define symbols for stored data, documents, notes, work done by hand and jumps between pages. A few of them earn a place in everyday charts. Many of the rest describe 1970s computer hardware: FIPS PUB 24 has separate symbols for a punched card, a deck of cards, magnetic tape, punched tape and a magnetic drum (NIST). You can safely leave those out.
These are the extra symbols worth knowing, with the shapes Wikipedia and ASQ use (Wikipedia, ASQ), with the key for each shape that has one. Most flowcharts use one or two of them, if any:
Symbol | Shape and key | Use it when |
|---|---|---|
Database | A cylinder (key | Information is stored, such as a ledger or customer records |
Document | A rectangle with a wavy bottom | A step produces a document, such as a report or an invoice |
Annotation | Whimsical’s annotation, a note with an arrow ( | A step needs a note to explain it |
Predefined process | A rectangle with double side edges | A step is a whole process drawn elsewhere |
Manual operation | A trapezoid, wide side on top | A chart separates work done by hand from work a system does |
Preparation | A long hexagon (key | Something is set up before the next step |
Delay | A half circle, like a D | A chart measures waiting time on purpose. Most charts write the wait in a rectangle (the 1970 standard drew a delay as a terminal) |
A rule of thumb for the long tail: if a reader would need a legend to understand a symbol, write the meaning into a rectangle’s label instead. “Wait 24 hours for approval” in a rectangle is clearer than a delay symbol most people have never seen.
Here’s a real process, an employee’s expense claim, drawn with all five basic symbols and two of the extras. Each shape was chosen for what the step does, and the text version says why. The decision, “Over $500?”, is where a claim can take a second path: bigger claims need the finance director’s approval.
Figure 2Flowchart symbols example: an expense claim. An expense claim from submission to payment, using seven kinds of symbols. The decision, Over $500?, is where the process splits: bigger claims need a second approval.
A good flowchart label matches its shape: an event in an oval, who does what in a rectangle, a yes/no question in a diamond, and a thing (not an action) in a parallelogram. Most hard-to-read flowcharts use the right shapes with the wrong words. Here are four labels from the example, the way they often get written and the way they read on the board:
Start
Terminal: Employee submits a claim
Approval
Process: Finance director approves
Check amount
Decision: Over $500?
Manager gets the receipt
Input/output: Receipt and claim form
Read the chart out loud. Every rectangle should read as a sentence (“Finance pays the claim”) and every diamond as a question you can answer yes or no. A label that doesn’t is usually in the wrong shape.
Use a rectangle unless a step clearly needs another flowchart symbol. The usual mix-ups: a check is a diamond only when the work can go two ways afterwards, a wait is still a rectangle (“Wait 24 hours for approval”), a form or file is a parallelogram rather than a step, and a whole process drawn on another chart is a predefined process.
Figure 3Which flowchart symbol should you use? The steps people most often draw in the wrong shape. The first answer, the process rectangle, is right for most steps, checks and waits included.
What is this step, really?
Draw a flowchart by writing the steps first and choosing shapes second: list what happens from start to finish, then give each step the shape that fits it and join them in order. Use as few kinds of shapes as the process allows. A chart with five kinds is easier to read than one with twelve.
In Whimsical, press S to open the diagram shapes, or the shape’s own key from the tables above, such as R for a rectangle or D for a diamond, then use the quick add buttons to add the next connected shape, or press C to draw a connector. For notes, use Whimsical’s annotation, a note with an arrow you drag to the step it explains, as in the example: press W to switch to Wireframe mode, then A to add one. Getting started with flowcharts covers the basics.
When the hand-offs between people matter more than the steps, add lanes so each step sits with whoever does it. How to map a process with a workflow diagram walks through that.
Yes, an AI assistant can draw a flowchart from a written description, and it usually gets the core shapes right: rectangles for steps and diamonds for questions. We’d still check two things before sharing it: that every connector leaving a diamond has its answer, and that forms and files aren’t drawn as steps. A model only knows the process you described.
In Whimsical, Whimsical Agent builds flowcharts on a board from a description, and the Whimsical connector for Claude does the same from Claude. This prompt asks for the same symbols as the example above:
There’s no official list of seven flowchart symbols, so lists differ. We’d pick the basic five plus the database, a cylinder where information is stored, and the annotation, a note with an arrow to the step it explains. Those seven cover almost every business process without symbols your readers would need a legend for.
The four types of flowcharts in the classification Wikipedia cites (Sterneckert, 2003) are document flowcharts, data flowcharts, system flowcharts and program flowcharts. Business teams tend to use other names, such as process flowcharts, swimlane diagrams and workflow diagrams. All of them draw with the same symbols.
A basic flowchart is a flowchart that shows one process from start to finish using only the basic five symbols. It has no lanes for who does each step, no data stores and no extra notation, which makes it the easiest kind of flowchart to draw and to read. Add lanes when the hand-offs between people are what the reader needs to see.
A flowchart needs a legend only when it uses symbols or colours your readers might not know. A chart built from ovals, rectangles, diamonds and connectors doesn’t need one, because those shapes are widely understood. If the legend grows past two or three lines, simplify the symbols instead of explaining them.
Draw a flowchart with standard shapes
The flowchart maker has ovals, rectangles, diamonds, parallelograms and cylinders, and adds the next connected shape in one click.
Open the flowchart maker